Mostrando entradas con la etiqueta Pipelines. Mostrar todas las entradas
Mostrando entradas con la etiqueta Pipelines. Mostrar todas las entradas

viernes, 28 de agosto de 2026

Los Ramones

Agua Dulce Pipeline.

  • Location: From Agua Dulce, Nueces County to Río Grande City, TX.
  • Firm: NET Mexico Pipeline Patners, LLC.
  • Owners: NET Midstream (90%), MGI Enterprises (10%).
  • Parent Company: NextEra Energy Partners (90%), Petróleos Mexicanos (PEMEX) (10%).
  • Current capacity: 2100 Million cubic feet per day.
  • Length: 124 miles / 200 km.
  • Diameter: 42 inches.
  • Stations: Estación Agua Dulce, TX, con 168,980 HP de potencia.
  • Status: Operating.
  • Start Year: 2014.
  • Cost: $760 million.
  • Financing: US$664 million in debt financing from MUFG, BBVA, Crédit Agricole, ING, Natixis, NordLB, Royal Bank of Canada and Santander.

Los Ramones I

  • Location: From Frontera compression station in Camargo, Tamaulipas to the Los Ramones compression station in Nuevo León.
  • Operator: IEnova / Gasoductos del Noreste.
  • Owner: IEnova (100%).
  • Parent Company: Sempra Energy.
  • Current capacity: 21.7 bcm/y.
  • Length: 116 km.
  • Diameter: 48 inches.
  • Stations: Estación de Compresión Frontera y Los Ramones, con un potencial total de 123,000 HP.
  • Status: Operating.
  • Start Year: 2014.
Los Ramones II North

  • Location: Los Ramones, Nuevo Leon and Villa Hidalgo, San Luis Potosí.
  • Operator: IEnova / TAG Pipelines Norte.
  • Owner: IEnova (50%), Brookfield Infrastructure Partners (50%).
  • Parent Company: Sempra Energy, Macquarie, Engie, Pemex.
  • Current capacity: 14.8 bcm/y.
  • Length: 452 km.
  • Diameter: 42 inches.
  • Stations: Villagrán, Tamps., y Doctor Arroyo, NL., de 61,500 HP cada una.
  • Status: Operating.
  • Start Year: 2016.

Los Ramones II South

  • Location: From Villa Hidalgo, San Luis Potosí to Apaseo El Alto, Guanajuato.
  • Operator: Engie / TAG Pipelines Sur.
  • Owner: Engie (50%), MIP Seis Ocho Gas (45%), Pemex (5%).
  • Parent Company: Engie (50%), Macquarie Asset Management (45%), Pemex (5%).
  • Current capacity: 14.7 bcm/y.
  • Length: 292 km.
  • Diameter: 42 inches.
  • Station: CS3 Villa Hidalgo, de 27,400 HP.
  • Status: Operating.
  • Start Year: 2016.