Agua Dulce Pipeline.
- Location: From Agua Dulce, Nueces County to Río Grande City, TX.
- Firm: NET Mexico Pipeline Patners, LLC.
- Owners: NET Midstream (90%), MGI Enterprises (10%).
- Parent Company: NextEra Energy Partners (90%), Petróleos Mexicanos (PEMEX) (10%).
- Current capacity: 2100 Million cubic feet per day.
- Length: 124 miles / 200 km.
- Diameter: 42 inches.
- Stations: Estación Agua Dulce, TX, con 168,980 HP de potencia.
- Status: Operating.
- Start Year: 2014.
- Cost: $760 million.
- Financing: US$664 million in debt financing from MUFG, BBVA, Crédit Agricole, ING, Natixis, NordLB, Royal Bank of Canada and Santander.
Los Ramones I
- Location: From Frontera compression station in Camargo, Tamaulipas to the Los Ramones compression station in Nuevo León.
- Operator: IEnova / Gasoductos del Noreste.
- Owner: IEnova (100%).
- Parent Company: Sempra Energy.
- Current capacity: 21.7 bcm/y.
- Length: 116 km.
- Diameter: 48 inches.
- Stations: Estación de Compresión Frontera y Los Ramones, con un potencial total de 123,000 HP.
- Status: Operating.
- Start Year: 2014.
Los Ramones II North
- Location: Los Ramones, Nuevo Leon and Villa Hidalgo, San Luis Potosí.
- Operator: IEnova / TAG Pipelines Norte.
- Owner: IEnova (50%), Brookfield Infrastructure Partners (50%).
- Parent Company: Sempra Energy, Macquarie, Engie, Pemex.
- Current capacity: 14.8 bcm/y.
- Length: 452 km.
- Diameter: 42 inches.
- Stations: Villagrán, Tamps., y Doctor Arroyo, NL., de 61,500 HP cada una.
- Status: Operating.
- Start Year: 2016.
Los Ramones II South
- Location: From Villa Hidalgo, San Luis Potosí to Apaseo El Alto, Guanajuato.
- Operator: Engie / TAG Pipelines Sur.
- Owner: Engie (50%), MIP Seis Ocho Gas (45%), Pemex (5%).
- Parent Company: Engie (50%), Macquarie Asset Management (45%), Pemex (5%).
- Current capacity: 14.7 bcm/y.
- Length: 292 km.
- Diameter: 42 inches.
- Station: CS3 Villa Hidalgo, de 27,400 HP.
- Status: Operating.
- Start Year: 2016.